603 CARTHAGE STREET
SOLAR, OFFICE, LEED GOLD SHELL, LEED PLATINUM FIT-UP
Sanford, NC
Crenshaw Consulting Engineers Provided the Electrical, Mechanical, Plumbing, Fire Alarm and Photovoltaic Engineering Designs.
|
Provided the design and electrical engineering for a 2.3 kWdc photovoltaic system. The system consisted of 16 flex light 144W laminate modules on the roof of this building. The system power will be used to supplement the building electrical service.
Crenshaw Consulting Engineers, Inc. provided the plumbing, mechanical, electrical, fire alarm and photovoltaic engineering designs as well as performed the commissioning for this 12,000 SF newly built office building. In addition to providing engineering designs for the shell, CCE provided the plumbing, mechanical, and electrical engineering designs for LEED Platinum fit-up space with in the building as well. Approximate Construction Cost: $2.6 million. Our on-site commissioning services included verification of:
|