IBM CAMPUS | RTP, Durham, NC
Buildings 635 & 695 |
Office fit ups & renovations
Provided the plumbing, mechanical, and electrical engineering designs 167,000 SF |
Building 201 |
Renovation from a former manufacturing facility into office and meeting spaces
Provided the plumbing, mechanical, electrical, and fire alarm engineering designs 35,000 SF |
Building 001 |
ISSC Command Center
Provided the electrical engineering designs 12,000 SF |
Building 695 |
Provided the electrical engineering designs for several projects within this building; revisions to office spaces, cafeteria, and laboratory space.
|
Building 062 |
Provided the fire alarm engineering designs
306,215 SF |
Building 002 |
Provided the fire alarm engineering designs
412,025 SF |
Building 306 |
Provided the fire alarm engineering designs
80,905 SF |
Building 305 VESDA |
Provided the fire alarm engineering designs
|
Building 500 | Collaboration Rooms |
Provided mechanical engineering
7,000 SF LAB |
Building 001 | Clean Steam |
Provided mechanical and electrical to remove live building steam humidifier system from a large air handler with local electrical steam generator to provide humidification for lab.
|